Wyre Forest
Model Railway Club
KINLET JUNCTION
Layout Manager Phil Round, Deputy Alistair Buchan
It was originally planned to refurbish this modern image ‘n’ gauge layout but on examination it was felt that
the baseboards/track were no longer up to modern standards. The layout has subsequently been scrapped
and a plan drawn up for a replacement using mostly the track configuration of the original. Baseboards are
being built by Philip Round. Six are complete, two in progress and four to come. The differing track levels
are being built in to the baseboards.
The full size plans and boards
laid on the legs for the first time